Development, Construction, Operation and Maintenance of Shouhang Dunhuang 100 MW Molten Salt Solar Power Tower Plant

Autor/innen

DOI:

https://doi.org/10.52825/solarpaces.v2i.771

Schlagworte:

Concentrated Solar Power, Commercial Project, Tower Plant, Lessons Learned

Abstract

The Shouhang Dunhuang 100 MW molten salt solar power tower plant is the first 100 MW-scale commercial demonstration project in China. The plant started to break ground in October 2016, was completed and connected to the grid for power generation in December 2018, and achieved full-load operation in June 2019. This paper comprehensively introduces the development, design, and construction process of the project as well as its operation and maintenance over the past five years, and shares experiences and lessons learned from the project.

Downloads

Keine Nutzungsdaten vorhanden.

Literaturhinweise

A. H. Alami, A. G. Olabi, A. Mdallal, A. Rezk, A. Radwan, S. M. A. Rahman, M. A. Abdelkareem, “Concentrating solar power (CSP) technologies: Status and analysis,” International Journal of Thermofluids, vol.18, pp.100340, 2023, doi: https://doi.org/10.1016/j.ijft.2023.100340.

X. Jia, Y. Zhang, R. R. Tan, Z. Li, S. Wang, F. Wang, K. Fang, “Multi-objective energy planning for China's dual carbon goals,” Sustainable Production and Consumption, vol.34, pp. 552-564, 2022, doi: https://doi.org/10.1016/j.spc.2022.10.009.

X. Huo, D. Jiang, Z. Qiu, S. Yang, “The impacts of dual carbon goals on asset prices in China,” Journal of Asian Economics, vol. 83, pp. 101546, 2022, doi: https://doi.org/10.1016/j.asieco.2022.101546.

F. Du, “Blue book of China's concentrating solar power industry 2022,” 1th ed. Beijing, China: China Solar Thermal Alliance, 2023. pp. 8–15.

Veröffentlicht

2024-07-24

Zitationsvorschlag

Huang, W., Xiao, J., Liu, F., & Qi, Z. (2024). Development, Construction, Operation and Maintenance of Shouhang Dunhuang 100 MW Molten Salt Solar Power Tower Plant. SolarPACES Conference Proceedings, 2. https://doi.org/10.52825/solarpaces.v2i.771
##plugins.generic.dates.received## 2023-10-05
##plugins.generic.dates.accepted## 2024-06-28
##plugins.generic.dates.published## 2024-07-24