Modeling the Guaranteed Performance of CSP Plants

Autor/innen

DOI:

https://doi.org/10.52825/solarpaces.v1i.741

Schlagworte:

Concentrating Solar Power, CSP, Guaranteed Performance, Performance Model, Project Finance, Financial Model, EPC Contractor, Final Acceptance Test

Abstract

Performance models are an essential tool for the development, design optimization, and estimation of the expected performance or yield of concentrating solar power (“CSP”) plants. It has also become common practice to use performance models to calculate the guaranteed performance of CSP plants for evaluating whether a newly constructed CSP plant has met its performance obligations. Although this would seem to be an obvious approach, actual experience has shown that insufficient thought has gone into how this should be done, and the performance models used have generally not been up to the task. We discuss some of the issues in relation to defining the guaranteed performance of a CSP plant, using a performance model to determine the guaranteed performance, and issues related to assessing whether the plant has met its guaranteed performance. We provide recommendations for how future projects should address these issues.

Downloads

Keine Nutzungsdaten vorhanden.

Literaturhinweise

SolarPACES Guideline for Bankable STE Yield Assessment –Version 2017, Edited by Tobias Hirsch, http://www.solarpaces.org.

B. Wittmer, A. Mermoud, T. Schott “Analysis of PV Grid Installations Performance, Comparing Measured Data to Simulation Results to Identify Problems in Operation and Monitoring”, European Photovoltaic Solar Energy Conference – Hamburg, Germany, 14-18 September 2015.

Black & Veatch, Independent Review of PV Design Software, Project No. 408566, https://go.ratedpower.com/reports/bv-pvsyst.

Veröffentlicht

2024-02-12

Zitationsvorschlag

Price, H., & Rademeyer, G. (2024). Modeling the Guaranteed Performance of CSP Plants. SolarPACES Conference Proceedings, 1. https://doi.org/10.52825/solarpaces.v1i.741